closed: Resolved #175150

Blocked Sidewalk:

Other: Sidewalk on south side of 17th st, across from 924 w 17th. Mud has again accumulated from the runoff at the tri north construction site. When it's raining, the whole hillside now drains onto the sidewalk, from the tri north driveway west to the western property line. This sidewalk gets the direct runoff of a whole acre now. The sidewalk is now a culvert for the hillside. Nothing serves as a culvert for the sidewalk. A river flows through the sidewalk. This isn't going to go away when the grass grows back. It will be a complicated and expensive problem to solve. Please make addressing this drainage problem a condition of signing off on their work and getting their ROW escrow back, or this sedimentation will continue indefinitely. Thanks!

History

3/24/2021 10:04:51 Closed by Anonymous

Stormwater staff conducted a follow-up site visit and verified that the sidewalk had been cleaned.

Sent notification to Anonymous, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=175150 Closed by Melissa Shaber Stormwater staff conducted a follow-up site visit and verified that the sidewalk had been cleaned.

3/24/2021 10:01:54 Anonymous commented on this case.

Stormwater staff inspected the sidewalk area on 3/23/21. The sidewalk had been cleaned and erosion and sediment control measures near the area repaired.

Sent notification to Anonymous, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=175150 Melissa Shaber commented on this case. Stormwater staff inspected the sidewalk area on 3/23/21. The sidewalk had been cleaned and erosion and sediment control measures near the area repaired.

3/23/2021 09:15:19 Anonymous commented on this case.

Stormwater staff have contacted the responsible party and will conduct a follow-up inspection to verify compliance.

Sent notification to Anonymous, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=175150 Melissa Shaber commented on this case. Stormwater staff have contacted the responsible party and will conduct a follow-up inspection to verify compliance.

3/22/2021 08:13:07 Emily Herr assigned this case to Anonymous

Hi Melissa, I believe the origin of this complaint is because of the stormwater runoff coming from the Tri-North site (Rule 5). I've also let Engineering Sr. Project Manager Roy Aten know about this concern as it relates to the area along the north of the site that is in the ROW.

Sent notification to Anonymous, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=175150 Emily Herr assigned this case to Melissa Shaber You can use the link to follow progress on this case. Hi Melissa, I believe the origin of this complaint is because of the stormwater runoff coming from the Tri-North site (Rule 5). I've also let Engineering Sr. Project Manager Roy Aten know about this concern as it relates to the area along the north of the site that is in the ROW.

3/18/2021 14:24:02 Karina Pazos assigned this case to Emily Herr

Sent notification to Emily Herr, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=175150 Karina Pazos assigned this case to Emily Herr You can use the link to follow progress on this case.

3/18/2021 14:04:05 Anonymous assigned this case to Karina Pazos

Sent notification to Karina Pazos, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=175150 Anonymous assigned this case to Karina Pazos You can use the link to follow progress on this case.

3/18/2021 14:04:05 Opened by Anonymous