4/15/2021 14:44:32 Closed by Danna Workman
Thank you for reporting, potholes have been repaired.
Other: Roadway deterioration Anita x E. Second, as well as E. Second street between Anita and Rose.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 11 days have already passed.
Thank you for reporting, potholes have been repaired.