4/27/2021 15:40:03 Closed by Anonymous
Thank you for your Ureport. Hot patch crew was in this area 4-27-21
Other: On the East Side: E Second, around the corner from Eastside Drive: strip of pavement is missing; several potholes on High Street, after the intersection with E Second Street, near the ECC grounds; In the crosswalk on High Street near Hunter; Holes around the manhole cover on High Street near the intersection with Atwater. pothole in the 1900 bloc of Ruby, middle of the road, near the intersection with Nancy; on E First Street, before the intersection with High Street, at the last speed bump before the corner with High.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 1 days have already passed.
Thank you for your Ureport. Hot patch crew was in this area 4-27-21