6/7/2021 13:58:43 Closed by Anonymous
CBU supervisor went to the site,then spoke to engineering department about it. CBU engineering department has added extra pipe for flooding. And a supervisor will monitor the pipes to make sure that they are not blocked up and flooding. If you would like, you could call engineering and ask for Phil Peden @ 812-349-3634.
Sent notification to Anonymous, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=176001
Closed by Kathleen Powell
CBU supervisor went to the site,then spoke to engineering department about it. CBU engineering department has added extra pipe for flooding. And a supervisor will monitor the pipes to make sure that they are not blocked up and flooding. If you would like, you could call engineering and ask for Phil Peden @ 812-349-3634.
6/3/2021 13:17:11 Anonymous assigned this case to Anonymous
Sent notification to Anonymous, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=176001
Anonymous assigned this case to Kathleen Powell
You can use the link to follow progress on this case.