7/13/2021 08:53:08 Closed by Roy Aten
The project has a pedestrian detour in place. That mandatory detour route was selected by the design engineer and based on the shortest route that can maintain ADA compliance. This project is only one portion of the City's long-range plan for trails and multi-use paths. Future phases will continue the multi-use path north along High Street to meet up with not only the Covenanter Greenway but also 2nd and 3rd Streets.
Sent notification to Roy Aten
https://bloomington.in.gov/crm/tickets/view?ticket_id=176464
Closed by Roy Aten
The project has a pedestrian detour in place. That mandatory detour route was selected by the design engineer and based on the shortest route that can maintain ADA compliance. This project is only one portion of the City's long-range plan for trails and multi-use paths. Future phases will continue the multi-use path north along High Street to meet up with not only the Covenanter Greenway but also 2nd and 3rd Streets.
7/7/2021 12:01:14 Tim Street assigned this case to Roy Aten
Sent notification to Roy Aten
https://bloomington.in.gov/crm/tickets/view?ticket_id=176464
Tim Street assigned this case to Roy Aten
You can use the link to follow progress on this case.
7/6/2021 11:36:21 Anonymous assigned this case to Anonymous
Sent notification to Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=176464
Anonymous assigned this case to Paula McDevitt
You can use the link to follow progress on this case.