closed: Resolved #177352

Blocked Sidewalk:

Other: Hello! The path for students to walk to/from school is not safe. The crossguard cannot help students cross at High and Greenbriar AND navigate around the closed sidewalk. The gravel/dirt path needs to be completed ASAP so students, parents, staff, and other residents can walk safely. My assumption is that path cannot be complete until the electrical lines in front of 2102 High Street are relocated. If this is the case, please let me know who I can contact about relocating the electrical lines so the path can be paved and this project can be wrapped up. We were told the path would be complete by the start of the school year and are becoming increasingly frustrated with the unsafe environment.

Assigned to
Roy Aten

History

10/1/2021 10:15:02 Closed by Roy Aten

The path has been repaved and is now ADA compliant.

Sent notification to Roy Aten, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=177352 Closed by Roy Aten The path has been repaved and is now ADA compliant.

9/13/2021 11:57:33 Roy Aten contacted Anonymous

Gayle, The City meet with the contractor last Friday in order to get this resolved as soon as possible. The section south of Rock Creek had a completion date in August, while the section north of Rock Creek has a completion date of November. The contractor has completed all of the drives and will be in this week or next to repair the asphalt path. The area with the down-guys on the utility pole will have a temporary path installed so that the path can be opened until the utility company completes their work. I will leave this issue open for now as we all keep an eye on the project over the next couple of weeks to see the pavement repairs. Thank you, Roy Aten

Sent notification to Roy Aten, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=177352 Roy Aten contacted gayle bandy Gayle, The City meet with the contractor last Friday in order to get this resolved as soon as possible. The section south of Rock Creek had a completion date in August, while the section north of Rock Creek has a completion date of November. The contractor has completed all of the drives and will be in this week or next to repair the asphalt path. The area with the down-guys on the utility pole will have a temporary path installed so that the path can be opened until the utility company completes their work. I will leave this issue open for now as we all keep an eye on the project over the next couple of weeks to see the pavement repairs. Thank you, Roy Aten

9/13/2021 11:38:33 Andrew Cibor assigned this case to Roy Aten

Sent notification to Roy Aten, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=177352 Andrew Cibor assigned this case to Roy Aten You can use the link to follow progress on this case.

9/13/2021 10:49:09 Adam Wason assigned this case to Andrew Cibor

Sent notification to Andrew Cibor, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=177352 Adam Wason assigned this case to Andrew Cibor You can use the link to follow progress on this case.

9/9/2021 16:23:26 Anonymous assigned this case to Anonymous

Sent notification to Anonymous, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=177352 Anonymous assigned this case to Paul Kehrberg You can use the link to follow progress on this case.

9/9/2021 16:23:26 Opened by Anonymous

High St and Wimbleton Ln (Inbound-Northbound), Bloomington, IN 47401, USA

CityBloomington
StateIN
Latitude39.143978118896
Longitude-86.508239746094