8/7/2024 15:27:09 Closed by Jane Fleig
Project has been completed.
Other: This morning around 7:00 -7:30 while on my morning walk I had two mishaps with regard to the construction work around or near the 4th st. fire station. First, crossing Kirkwood st. A dump truck (Young construction) decided to cut me off at the pedestrian crossing at Kirkwood and Dunn st. Next, a large loader (Milestone Construction) decided to back up without looking. I was on the sidewalk all the time and was within inches of getting KIlled. I yelled very loud and the operator heard over the machine and stopped. I do not believe I should have such experiences with just a simple walk. I have noticed over many weeks that this project is a slip-shod operation with a lack of management. Perhaps IOSHA needs to be alerted. Ken Bartell
Project has been completed.
Can we close this one?
Jane, I was told to reassign this to Engineering.
Jane- I spoke with Josh late last week about Milestone site and equipment safety. Please pass this along to him as well.