1/4/2022 10:50:54 Closed by Anonymous
Plans are to repave in spring. Ran out of time before plants closed and paved the deteriorated pavement with what was left.
Other: I am wondering why Olcott was left in this condition while repaving recently. This seems to be a good way for water to collect and even freeze if we get colder weather. Is there a plan to smooth this out? Could I also request that the end of Olcott/ Moores Pike gets a look. Already there has been Ice pools at the crease from paving. It’s a dangerous situation if a car cannot stop when ice forms there. Thank you Sharon
Most tickets of this type should be closed within 7 days, although some cases may be longer. 3 days have already passed.
Plans are to repave in spring. Ran out of time before plants closed and paved the deteriorated pavement with what was left.