5/31/2022 05:56:34 Closed by Anonymous
Stella, we are trying to catch up on our long list of patching notes and we will add this to it.
Other: Potholes on E First at the speed bumps in front of #1852 and #2028 (the new house). Continuing towards Sheridan, pothole near the YIELD sign on the right hand side after the last speed bump on E First before it becomes Sheridan. This is (closed?) case #178726 (Febr. 1, 2022) and #179389 March 29, 2022). Continuing on E First towards Highland, several more potholes on the south side of the road starting at the intersection with Eagleson.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 1 days have already passed.
Stella, we are trying to catch up on our long list of patching notes and we will add this to it.