8/9/2022 14:55:06 Closed by Anonymous
Project is not finished so there would not be an inspection until it's completed. ADA ramps are installed BEFORE the paving crew to make a smooth transition.
Other: How is the city inspecting the newly installed curb cuts on E 2nd St. between Mitchell and High to ensure they are accessible? Several of these new curb cuts seem to have been completed, but they are not flush with the pavement -- they have at least a 1 inch lip on them.
Project is not finished so there would not be an inspection until it's completed. ADA ramps are installed BEFORE the paving crew to make a smooth transition.
City | Bloomington |
---|---|
State | IN |
Latitude | 39.161041259766 |
Longitude | -86.514190673828 |
Status | Case Date | Category |
---|