8/19/2022 09:16:22 Closed by Jane Fleig
The project in this area is complete but I will work with the contractor or the Street Dept to resolve the bump in the drive.
Other: I live at the corner of 16th and Hancock . I have two points to address. the first, is thtat I talked with an individual last year involved with storm water just after the culvert at my corner had been replaced, and advised this had been a missed opportunity to upsize this culvert, and that I had witnessed overflow of the corner culvert in a number of storms. this past tuesday, August 9, 2022, we had about an hour of rain. Included are pictures of the overflow that lasted about 45 minutes after rain had ceased. My street has recently been repaved and i thought , perhaps a remedy might be included in this process, however, no. Additionally, thegravel shoulder that has been added to finalize this new repaving process has stopped short of my property, and the new asphalt topping was not tapered onto my asphalt driveway, even though they primed a sweep into my drive, indicating to me that bonding a transition had probaly originally been intended. Now i have a bump approaching the street that is collecting gravel from these overwash events. the North side of 16th between Monroe and Hancock has not had a gravel shoulder appliction. Is ther more work scheduled to complete the gravel shoulder. Please view the pictures included. thanks, bill Goodhew PS I have two more pictures, but this report format does not allow me to load more than one. Happy to send them to someones phone
The project in this area is complete but I will work with the contractor or the Street Dept to resolve the bump in the drive.
The project that was just completed was a water main replacement project. Unfortunately, I was not aware of the issue with storm pipe prior to directing our contractor to resurfacing of the street. The resurfacing was added due to the condition of the existing streets. The gravel shoulder was only added in limited areas where there was concern about the drop off from the new edge of pavement. The contract has been closed out but we have a warranty period and I will try to get them to smooth out the bump at your drive.
Joe said to send this to you. It was a Utilities project.