12/30/2022 15:08:48 Closed by Neil Kopper
The City is aware that additional visibility would be desirable. A few years ago minor improvements to visibility were made by shifting the northbound Highland traffic farther west within the roadway. Additional improvements would require significant geometric or operational changes. A future corridor study is planned for this area which will consider options to improve this intersection.
Sent notification to Neil Kopper, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=181877
Closed by Neil Kopper
The City is aware that additional visibility would be desirable. A few years ago minor improvements to visibility were made by shifting the northbound Highland traffic farther west within the roadway. Additional improvements would require significant geometric or operational changes. A future corridor study is planned for this area which will consider options to improve this intersection.
10/24/2022 11:26:12 Andrew Cibor assigned this case to Neil Kopper
Sent notification to Neil Kopper, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=181877
Andrew Cibor assigned this case to Neil Kopper
You can use the link to follow progress on this case.
10/24/2022 10:19:28 Anonymous assigned this case to Andrew Cibor
They are talking about a building (TIS)
Sent notification to Andrew Cibor, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=181877
Chris Axsom assigned this case to Andrew Cibor
You can use the link to follow progress on this case.
They are talking about a building (TIS)
10/21/2022 16:16:56 Anonymous assigned this case to Danna Workman
Sent notification to Danna Workman, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=181877
Anonymous assigned this case to Danna Workman
You can use the link to follow progress on this case.