11/9/2022 06:17:23 Closed by Anonymous
Grandview was paved from 45 to Kerry in 2016. We will access from Kerry to Smith Ave for 2023 paving schedule.
Other: Grandview Drive gets a lot of traffic often as a short cut when 10th is blocked. It does need to be resurfaced.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 1 days have already passed.
Grandview was paved from 45 to Kerry in 2016. We will access from Kerry to Smith Ave for 2023 paving schedule.