3/16/2023 10:27:48 Closed by Jason Kerr
We are aware of this spot in the asphalt. There is a top layer that still needs placed. This will be done as soon as we are able.
Other: Moors and Clarizz, the fiber contractors left a large rectangular hole in the asphalt by the arbors entrance
We are aware of this spot in the asphalt. There is a top layer that still needs placed. This will be done as soon as we are able.
City | Bloomington |
---|---|
State | IN |
Zip | 47401 |
Latitude | 39.150051116943 |
Longitude | -86.491142272949 |
Township | Perry |
Status | Case Date | Category | |
---|---|---|---|
closed | 6/5/2024 | Potholes, Other Street Repair |