5/30/2023 14:55:17 Closed by Danna Workman
This area is scheduled for resurface in 2023.
Other: Multiple potholes and areas of damaged and/or uneven road between Winslow/Walnut intersection and second I-69 roundabout on Tapp Road. Entire area badly needs repaved.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 5 days have already passed.
This area is scheduled for resurface in 2023.
| City | Bloomington |
|---|---|
| State | IN |
| Latitude | 39.136581420898 |
| Longitude | -86.565711975098 |
| Status | Case Date | Category | |
|---|---|---|---|
| closed | 5/25/2023 | Potholes, Other Street Repair | |
| closed | 1/24/2023 | Potholes, Other Street Repair | |
| closed | 9/13/2021 | Trash | |
| closed | 3/31/2021 | Potholes, Other Street Repair |