6/12/2023 13:09:26 Closed by Jason Kerr
Continuous construction site, the roadway will be milled and repaved at the end of the construction poeriod.
Other: The work going on with utility poles from 17th & Rogers intersection to the Arlington roundabout is often dangerous for traffic. Local businesses are still open since they cut off the intersection itself and adjacent neighbors need access. Basically no street striping is present there’s random marks on one side that would be too tight of a lane, in addition to a partially ground up area of previous striping that still has a lot present and reflectors. The whole road needs redone. When is the projected finish of the utility pole relocation? This is a HUGE hazard.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 0 days have already passed.
Continuous construction site, the roadway will be milled and repaved at the end of the construction poeriod.