7/11/2023 10:46:22 Closed by Danna Workman
Thank you for reporting, Rogers St is on the paving list from Kirkwood to 11th St.
Other: Requesting Rogers street be placed on the replace/repave list. Including where the street name changes from the intersection with 46 all the way to intersection with 4th street. It has only gotten worse as new construction and utility work has increased recently. There are holes throughout everywhere and the seam of the road from old paving is splitting and increasing in depth every week. This also happens to line up right where a car tire would be placed in the lane since there’s also a bike lane. Please fix this so drivers don’t have to continue to swerve and ride into the bike lane to avoid damage.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 29 days have already passed.
Thank you for reporting, Rogers St is on the paving list from Kirkwood to 11th St.