8/30/2023 15:19:25 Closed by Danna Workman
Potholes have been repaired. We are looking into resurfacing request.
Other: S Kings Court and E Jordans Way in Hyde Park are both in dire need of resurfacing. With many areas of crumbling/cracking asphalt and numerous potholes, the streets have become a hazard for the many residents who depend on them. Please help!
Most tickets of this type should be closed within 7 days, although some cases may be longer. 43 days have already passed.
Potholes have been repaired. We are looking into resurfacing request.