8/29/2023 07:32:39 Closed by Anonymous
CBU supervisor did lay concrete down after the main break, and will be asphalting this area today.
Other: The repair to the pavement performed after utility upgrades has turned into a small lake. Location is north side of the west-bound lane at Fritz Drive
Most tickets of this type should be closed within 7 days, although some cases may be longer. 35 days have already passed.
CBU supervisor did lay concrete down after the main break, and will be asphalting this area today.
Have Kevin check this out. We had a main break and I’m not sure they have fixed the pavement back that may be causing this issue.
City | Bloomington |
---|---|
State | IN |
Latitude | 39.19087600708 |
Longitude | -86.531242370605 |
Status | Case Date | Category | |
---|---|---|---|
closed | 6/19/2023 | Street & Traffic Signs |