9/1/2023 08:10:54 Closed by Neil Kopper
The button-activated flashing beacons are intended for use by those using the pedestrian crosswalk. There is not a way to activate the beacon from the street. You are welcome to use the crosswalk during your crossing if you prefer to activate the beacon, or you can wait for a gap in traffic and travel to the median refuge island. Additional improvements to this intersection are being considered during the ongoing College-Walnut corridor study.
Sent notification to Neil Kopper, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=185190
Closed by Neil Kopper
The button-activated flashing beacons are intended for use by those using the pedestrian crosswalk. There is not a way to activate the beacon from the street. You are welcome to use the crosswalk during your crossing if you prefer to activate the beacon, or you can wait for a gap in traffic and travel to the median refuge island. Additional improvements to this intersection are being considered during the ongoing College-Walnut corridor study.
8/29/2023 16:12:07 Adam Wason assigned this case to Neil Kopper
Neil -
Can you/Engineering look into a comment about the pedestrian signal concern?
Sent notification to Neil Kopper, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=185190
Adam Wason assigned this case to Neil Kopper
You can use the link to follow progress on this case.
Neil -
Can you/Engineering look into a comment about the pedestrian signal concern?
8/29/2023 15:47:47 Adam Wason commented on this case.
The bridge is owned by the County and will not be repaired before 2027, based on our current understanding.
I'll be reassigning the case to the Engineering Department for responses on the signal issue.
Sent notification to Adam Wason, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=185190
Adam Wason commented on this case.
The bridge is owned by the County and will not be repaired before 2027, based on our current understanding.
I'll be reassigning the case to the Engineering Department for responses on the signal issue.
8/23/2023 15:01:30 Anonymous assigned this case to Adam Wason
Sent notification to Adam Wason, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=185190
Anonymous assigned this case to Adam Wason
You can use the link to follow progress on this case.