11/20/2023 14:12:18 Closed by Alexandra Gray
The asphalt patch has been completed.
Other: A small square of asphalt (about 1 foot by 1 foot) was cut out of the road immediately in front of our driveway at 4021 E. Morningside Drive during a repair. It was filled with gravel but has not yet been repaved so are requesting that get filled in with asphalt/pave. Thank you.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 18 days have already passed.
The asphalt patch has been completed.