1/17/2024 09:25:04 Closed by Cheyenne Bowlen
Thank you for reporting this. We will take this into consideration for 2024 resurfacing.
Other: This whole section of Patterson/Grimes (between Madison and Walnut) is in need of grading and resurfacing. The surface is super rough the whole way and there's a large raised bump under the bridge.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 4 days have already passed.
Thank you for reporting this. We will take this into consideration for 2024 resurfacing.
City | Bloomington |
---|---|
State | IN |
Latitude | 39.153179168701 |
Longitude | -86.53604888916 |