10/28/2024 10:31:10 Kyle Baugh assigned this case to Maria McCormick
Maria, Would you mind helping me figure out if there is a standard for the placement of the asphalt in relation to the curb in areas such as these?
Other: When the curb between the bike lane and car lane was reconstructed gaps were left in the pavement. Generally the pavement repair was not done to the standard usually expected of Bloomington roads.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 282 days have already passed.
Maria, Would you mind helping me figure out if there is a standard for the placement of the asphalt in relation to the curb in areas such as these?