2/26/2025 16:17:53 Closed by Adam Wason
We have reviewed the site of the entire project enclosure where the fencing is. There is only one section of non-contiguous sidewalk along near 18th Street that is part of the project site. The section along 19th does not have sidewalks currently. The good news is that the north side of 19th has a long multi-block contiguous section of accessible sidewalk between Lincoln and Dunn that was required of previous developments.
Sent notification to Adam Wason
https://bloomington.in.gov/crm/tickets/view?ticket_id=201183
Closed by Adam Wason
We have reviewed the site of the entire project enclosure where the fencing is. There is only one section of non-contiguous sidewalk along near 18th Street that is part of the project site. The section along 19th does not have sidewalks currently. The good news is that the north side of 19th has a long multi-block contiguous section of accessible sidewalk between Lincoln and Dunn that was required of previous developments.
2/26/2025 09:47:46 Anonymous assigned this case to Adam Wason
Sent notification to Adam Wason
https://bloomington.in.gov/crm/tickets/view?ticket_id=201183
Anonymous assigned this case to Adam Wason
You can use the link to follow progress on this case.