Other: A request for snow removal practices going forward. The location is where South Morton ends at the Convention Center overflow parking lot. Vehicle traffic is stopped by three yellow bollards, but many pedestrians and cyclists use this road to enter the B-line from Morton St. In past winters, snow plows push the snow into a large pile that entirely blocks off the end of S Morton St, so even pedestrians can't pass through. In the past, I have shoveled a pathway through, but it takes hours depending on the size of the pile and how frozen it is, and I have to redo it every time plows come through, and I go through at least 5 snow shovels per year since they break from the amount of snow I need to move. Now I have a back issue, so I can no longer shovel a path through. Can you please coordinate snow plowing so that the end of S Morton is not entirely blocked? Maybe a smaller plow (like they use on the B-line) could work with the larger plows to keep the path as open as possible. Thank you.
- Assigned to
- Cheyenne Bowlen
12/1/2025 12:15:24 Anonymous assigned this case to Cheyenne Bowlen
Sent notification to Cheyenne Bowlen, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=206983
Anonymous assigned this case to Cheyenne Bowlen
You can use the link to follow progress on this case.
12/1/2025 12:15:24 Opened by Anonymous