12/3/2025 16:29:13 Closed by Adam Wason
The project planned is a maintenance project to fix trip hazards and better secure the bricks for safety. Longer term plans for the future of Kirkwood would address what type of material would be used if the sidewalks were completely replaced.
Sent notification to Adam Wason
https://bloomington.in.gov/crm/tickets/view?ticket_id=207017
Closed by Adam Wason
The project planned is a maintenance project to fix trip hazards and better secure the bricks for safety. Longer term plans for the future of Kirkwood would address what type of material would be used if the sidewalks were completely replaced.
12/3/2025 13:52:14 Andrew Cibor assigned this case to Adam Wason
Sent notification to Adam Wason
https://bloomington.in.gov/crm/tickets/view?ticket_id=207017
Andrew Cibor assigned this case to Adam Wason
You can use the link to follow progress on this case.
12/3/2025 09:35:03 Michael Shermis assigned this case to Andrew Cibor
Andrew, I assume this is more directed at you all since that appears to be where choices for materials get made. But let me know if not. Thanks. Michael
Sent notification to Andrew Cibor
https://bloomington.in.gov/crm/tickets/view?ticket_id=207017
Michael Shermis assigned this case to Andrew Cibor
You can use the link to follow progress on this case.
Andrew, I assume this is more directed at you all since that appears to be where choices for materials get made. But let me know if not. Thanks. Michael
12/3/2025 09:06:17 Anonymous assigned this case to Michael Shermis
Sent notification to Michael Shermis
https://bloomington.in.gov/crm/tickets/view?ticket_id=207017
Anonymous assigned this case to Michael Shermis
You can use the link to follow progress on this case.