12/4/2025 09:18:37 Closed by Adam Wason
The project planned is a maintenance project to fix trip hazards and better secure the bricks for safety. Longer term plans for the future of Kirkwood would address what type of material would be used if the sidewalks were completely replaced.
Sent notification to Adam Wason, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=207039
Closed by Adam Wason
The project planned is a maintenance project to fix trip hazards and better secure the bricks for safety. Longer term plans for the future of Kirkwood would address what type of material would be used if the sidewalks were completely replaced.
12/4/2025 08:48:06 Michael Shermis assigned this case to Adam Wason
Given Andrew reassigned the other to you....
Sent notification to Adam Wason, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=207039
Michael Shermis assigned this case to Adam Wason
You can use the link to follow progress on this case.
Given Andrew reassigned the other to you....
12/3/2025 21:23:42 Anonymous assigned this case to Michael Shermis
Sent notification to Michael Shermis, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=207039
Anonymous assigned this case to Michael Shermis
You can use the link to follow progress on this case.