5/19/2026 09:05:08 Closed by Zach Bell
Thank you, You are correct. Some of these cuts are not complete and one must be cut again. This road was paved in 2022 so a full mill and pave is not required. All repairs except 111 and 208 South Jefferson Street are complete and were repaired with hot mix asphalt. Cold patch will be removed and replaced with hot mix at 208 South Jefferson Street in the near future. I spoke with the contractor previously about the repair at 111 S Jefferson Street and it will be recut and repaired when 208 South Jefferson Street is completed.
Sent notification to Zach Bell, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=210483
Closed by Zach Bell
Thank you, You are correct. Some of these cuts are not complete and one must be cut again. This road was paved in 2022 so a full mill and pave is not required. All repairs except 111 and 208 South Jefferson Street are complete and were repaired with hot mix asphalt. Cold patch will be removed and replaced with hot mix at 208 South Jefferson Street in the near future. I spoke with the contractor previously about the repair at 111 S Jefferson Street and it will be recut and repaired when 208 South Jefferson Street is completed.
5/18/2026 10:28:48 Cheyenne Bowlen assigned this case to Zach Bell
Sent notification to Zach Bell, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=210483
Cheyenne Bowlen assigned this case to Zach Bell
You can use the link to follow progress on this case.
5/4/2026 17:57:29 Anonymous assigned this case to Cheyenne Bowlen
Sent notification to Cheyenne Bowlen, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=210483
Anonymous assigned this case to Cheyenne Bowlen
You can use the link to follow progress on this case.