7/24/2026 14:37:01 Closed by Kyle Baugh
Max, Thank you for reporting this issue. The contractor was notified and the sidewalk has been re-poured and is now open to traffic.
Other: Sidewalk at the ongoing construction at new Bloomington Fire Operations Center is blocked with no alternate accessible path for pedestrians. Wheelchair user had to use the vehicle driving lane on busy road in order to get around the blocked sidewalk, because the shoulder of the road was also obstructed by cones and tape.
Max, Thank you for reporting this issue. The contractor was notified and the sidewalk has been re-poured and is now open to traffic.
| City | Bloomington |
|---|---|
| State | IN |
| Zip | 47403 |
| Latitude | 39.127086639404 |
| Longitude | -86.53295135498 |
| Township | Perry |
| Status | Case Date | Category |
|---|