6/17/2026 11:27:31 Closed by Cheyenne Bowlen
We are sending a crew to repair this issue.
Other: Pedestrian wooden bridge on E Second Street between Anita and Rose. Time to do a safety inspection? I feel unsafe when I walk on it.
Most tickets of this type should be closed within 9 days, although some cases may be longer. 2 days have already passed.
We are sending a crew to repair this issue.
| City | Bloomington |
|---|---|
| State | IN |
| Status | Case Date | Category | |
|---|---|---|---|
| closed | 2/15/2026 | Potholes, Other Street Repair | |
| closed | 9/16/2025 | Potholes, Other Street Repair |