6/30/2026 17:11:18 Closed by John Garzee
Thank you for flagging this. You are right that the signal timing at 2nd and Rogers needs to be adjusted for the College Avenue closure detour.
The timing that was initially provided was for regular conditions, and it did not adequately account for the added detour traffic using Rogers to turn east onto 2nd. That was an oversight on our end, and I apologize for the added delay and frustration.
We are already working with the temporary signal contractor to correct this. We are aiming to have the timing and left-turn operation adjusted by tomorrow’s evening commute.
John Garzee
Traffic Engineer
Sent notification to Cheyenne Bowlen
https://bloomington.in.gov/crm/tickets/view?ticket_id=212052
Closed by John Garzee
Thank you for flagging this. You are right that the signal timing at 2nd and Rogers needs to be adjusted for the College Avenue closure detour.
The timing that was initially provided was for regular conditions, and it did not adequately account for the added detour traffic using Rogers to turn east onto 2nd. That was an oversight on our end, and I apologize for the added delay and frustration.
We are already working with the temporary signal contractor to correct this. We are aiming to have the timing and left-turn operation adjusted by tomorrow’s evening commute.
John Garzee
Traffic Engineer
6/30/2026 16:41:24 Anonymous assigned this case to Cheyenne Bowlen
Sent notification to Cheyenne Bowlen
https://bloomington.in.gov/crm/tickets/view?ticket_id=212052
Anonymous assigned this case to Cheyenne Bowlen
You can use the link to follow progress on this case.