open #212077
Potholes, Other Street Repair:
Other: Berkshire Court: Disintegrated spots. I was told last summer that Berkshire Court would be repaved this summer. Have seen no sign of that yet. Is it still on the schedule?
- Assigned to
- Cheyenne Bowlen
Most tickets of this type should be closed within 7 days, although some cases may be longer. 0 days have already passed.