8/9/1995 05:00:00 Anonymous inspected this Location
INSPECTED SITE, 24" PIPE DRAIN ON TO MR. GOYLE'S PROPERTY CAUSING SOME EROSION PROBLEMS. WE WILL BE INCLUDING THIS PROBLEM AS PART OF THE DUNSTON DRAINAGE PROJECT. I TOLD MR. GOYLE I WOULD KEEP HIM INFORMED OF THE PROGRESS. Inspected site with Goyle at 2:20.pm. No city ordinances are being violated. No major erosion problems were visible. Checked with Bob Falk about the Dunston Drainage Project and that this site was included. I will notify Mr. Goyle of my findings. Gary T. Campell Project Inspector