City Construction Projects
1009 E Miller DR
- Case Date:
- 8/14/2024
You drove over countless potholes to install a bunch of new roadbumps! Congratulations, you just increased wear and tear and everyone's vehicles without making the roads any safer at all.
City Construction Projects
1109 E Wylie ST
- Case Date:
- 10/21/2024
20x20 site of digging, with tarps in place and visible cones. Neighbors say some crew started this last week, then abandoned it.
I certainly did not give anyone permission to enter my property, and if this is a right of way, it does not show on the plat.
I want it remediated, repaired, and reimbursement for the costs of this destruction of private property.
I'll contact the city attorney tomorrow.
City Construction Projects
1202 e 1st st and 1208 1st st
- Case Date:
- 11/6/2024
There is a hole at the curb at the end our adjoining driveways, 1202 and 1208 E 1st. This has developed after the attempted temporary fix which was made after attempting to find the source of a water leak. This was made during the installation of Gigabit now. It is 17 inches deep and when covered with leaves, not visible. Please fix this to prevent damage to our cars.
City Construction Projects
201-251 North Lincoln Street
- Case Date:
- 6/21/2017
Hi,
There's a couple of large road cuts at the intersection of Lincoln and 6th St. If the city is not planning on filling these any time soon could we at least get the sharp edges softened? Sometimes I've seen this done and it makes road cuts much easier to drive over without damaging your tires.
Thanks,
Vickie Nelson
Bloomington
City Construction Projects
220 W 14th ST
- Case Date:
- 9/10/2024
Sidewalk closed sign laying in the tree plot. There's no construction going on around here, so I am not sure how or why it's here. Just thought I would let you know in case you are missing one.
City Construction Projects
401 N Morton ST
- Case Date:
- 8/28/2024
What is happening again on Clarizz street. How much money and time has the city wasted on what ever project this is. Surely we have better uses for our resources. Connie Clark
City Construction Projects
500 W 2nd St
- Case Date:
- 8/15/2024
When road work done on 500 2nd street
City Construction Projects
500-520 S Walnut St
- Case Date:
- 4/18/2012
Regarding construction on South Walnut Street- at the intersection with second street, motorists are trying to go north from both lanes south of second into the single lane north of second street. These lanes need to be clearly marked during construction as typically the far left lane is for left turns only. Please make it easier for people to know where to go. Thanks.
City Construction Projects
613 E 12th ST
- Case Date:
- 8/18/2024
Prior to the recent construction at this intersection, the storm sewer drains on both sides of Fess just north of 12th Street were covered with thick, fibrous mats, ostensibly to prevent gravel from washing down there during the project. Now that the construction is complete, should those mats now be removed?
City Construction Projects
800 East 10th Street
- Case Date:
- 8/3/2018
Please see attached photo. This location is at 10th and Park and has been reported to the IU Grounds Dept. as a tripping hazard. The gray bucket is there to indicate a bus pickup for the Boy Scouts that are in town but the metal and the sandbags are blocking the sidewalk, our crews moved the items off the sidewalk and into the homeowners yard. Please pickup. Thanks Jill.