uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (105)

closed #187283

City Construction Projects

Case Date:
2/12/2024

Alexandra gray do you know when detour completed at other side of city hall

closed #187335

City Construction Projects

Case Date:
2/15/2024

I let you know There construction signs have fallen over on seventh street near city halls sign laying on grass

closed #187372

City Construction Projects

Bloomington Hospital Heliport, 2651 E Discovery Pkwy, Bloomington, IN 47408, USA

Case Date:
2/19/2024

Why there road work at new hospital

closed #187393

City Construction Projects

Case Date:
2/21/2024

Fiber cable is being installed underground on West side of High. There is the smell of skunk/gas in the area. This is south of the High St/Hillside/Moores Pk intersection. Utility flags have not been installed by the contractors servicing the area. The neighborhood is concerned re digging into utilities.

closed #187409

City Construction Projects

Case Date:
2/23/2024

kyle i just saw sign said road work at new hospital on tuesday i dont know why can you check it out for me and let me know

closed #187440

City Construction Projects

Bloomington City Hall, 401 N Morton St, Bloomington, IN 47401, USA

Case Date:
2/27/2024

At the corner of 3rd and Clarizz. Sitting at the light heading west and turning south onto Clarizz the concrete barrier sticks out in a manner that is not very visible at night. I blew a tire hitting the concrete bicycle median. I hope this makes sense. Than you.

closed #187659

City Construction Projects

Case Date:
3/18/2024

kyle why there fiber work near classic lane do you know when fiber work end

closed #187817

City Construction Projects

E 7th St & N Grant St, Bloomington, IN 47408, USA

Case Date:
3/28/2024

There is a large put next to the sidewalk at 7th and Grant that has been there for over a week. It used to have caution tape around it, but that has since disappeared, too. I just don’t want anyone to fall in! Thanks!

closed #173337

City Construction Projects

1005 S Covenanter DR

Case Date:
8/11/2020

The drainage easement at the south end of Greenwood Dr., where it dead ends into the sidewalk, is blocked with a landslide of debris. The water level rose to 3 feet on either side of the sidewalk and covered three properties adjacent to the clogged drain with water and debris. Thank you for your help. Jim and Debbie Quinn

closed #173347

City Construction Projects

2638 S Isabel CT

Case Date:
8/13/2020

Overgrown tree is dangerously close to our house. Its root system is damaging our driveway, is intertwined with our electrical boxes, and have roots hitting our house. We are requesting the removal of the tree and roots and the replanting of a new one. Please advise as we want to ensure that the overgrowth doesn't overlap with the winter months. There are better pictures, however, I can only upload 1 of them. Thank you.