City Construction Projects
- Case Date:
- 12/22/2022
The newly redone exit on Clarizz for Bloomingfoods East and the new apartment complex is too narrow by about 3 feet. It is nearly impossible for two vehicles to be in the intersection at the same time, and turning in or out is in-executable while another vehicle is present. Personally I have seen many instances that a car has to stop in the intersection to allow for a car to clear the way. This is a highly trafficked intersection that will only become more heavily traveled once the multiplex is finished and occupied. Thus, this intersection poses great risk for incident in its current configuration.
City Construction Projects
- Case Date:
- 2/11/2023
Stop light is not needed at John Hinkle and 10th per some reporter but is needed at the substantially busier and more dangerous intersection of Smith and 10th.
City Construction Projects
1521 S Arbors LN
- Case Date:
- 3/12/2023
Moors and Clarizz, the fiber contractors left a large rectangular hole in the asphalt by the arbors entrance
City Construction Projects
- Case Date:
- 3/28/2023
At 414 S Lincoln there is a nasty utility cut, no warning sign and no other option than to drive over it. Hope it can be fixed soon. Thanks!
City Construction Projects
1907 S Sussex DR
- Case Date:
- 11/1/2023
Fiber construction contractors (AEG?) were in our neighborhood (Sycamore Knolls) at the start of October. They've since moved on, but left open holes and piping sticking out the ground all over the place. These were visible, but with the falling leaves they have become numerous trip hazards spread throughout the neighborhood.
City Construction Projects
- Case Date:
- 12/12/2023
Will our reports and inquiries be professionally responded to? We cannot get a response from Gray
City Construction Projects
317 S Rogers ST
- Case Date:
- 12/6/2023
I let you know there duke engery doing road work 321 N Rogers St
Bloomington, IN 47404
United States
City Construction Projects
- Case Date:
- 12/12/2023
Kyle do you know when duke project done on 321 Roger street
City Construction Projects
- Case Date:
- 12/19/2023
There road work at old hospital
City Construction Projects
322 E Cottage Grove AVE
- Case Date:
- 4/11/2023
City and/or Utility contractors (Duke, Meridiam, etc.) have been leaving signage scattered about the neighborhood. Currently, there is the following:
1) Tall, metal support at SW corner of Cottage Grove and Grant (322 E. Grant), 2) Identical metal support on south retaining wall of 414 E. Cottage Grove, 3) Pile of signage and sandbags on NE corner of 325 E. 10th Street, 4) Pile of signs in west yard of 418 N. Grant, 5) Bag of construction waste (NaOH ?) sitting on east side of Lincoln near 518 N. Lincoln.