closed #181800

City Construction Projects

7th & Washington, Bloomington, IN 47408, USA

Case Date:
10/12/2022

Hi there! It seems like every week there is an accident at the intersection of N Washington and 7th street. I’m wondering if you could put a stop sign there since it’s really dangerous for people driving and pedestrians crossing. Thanks!

closed #182597

City Construction Projects

728 W Allen ST

Case Date:
1/24/2023

Intersection of Patterson and Allen. If heading north on Patterson, there is a hump as you cross Allen street at the light. When doing 30mph(the speed limit) it's enough to upset steering and cause traction control to come on.

closed #182178

City Construction Projects

709 N Keystone CT

Case Date:
11/30/2022

please add a traffic signal here this can be a dangerous intersection. a traffic signal here will aid the city bus (route 6 and 6L) in making its runs and traffic flow for cars, bikes and pedestrian's.

closed #192921

City Construction Projects

613 E 12th ST

Case Date:
8/18/2024

Prior to the recent construction at this intersection, the storm sewer drains on both sides of Fess just north of 12th Street were covered with thick, fibrous mats, ostensibly to prevent gravel from washing down there during the project. Now that the construction is complete, should those mats now be removed?

closed #181310

City Construction Projects

500 W Fairway LN

Case Date:
9/1/2022

New construction site on South Rogers is scattering debris on the road. I live in Clear Creek housing edition and have to travel on South Rogers every day for work. In the past 2 weeks I have had two separate issues with the same brand of screws in my back left tire. I travel on I69 for work and have been traveling at 60 miles an hour with a screw in my tire. This has happened twice in two weeks at no fault of my own. This set of tires is less than 6 months old and today I found out from Royal Mazda that I need to purchase a new tire. This is unacceptable from a point of safety for the South Rogers neighborhood and an additional cost to citizen(s) of Bloomington.

closed #187276

City Construction Projects

500 W 7th ST

Case Date:
2/12/2024

Why there detour sign on seventh street

closed #192891

City Construction Projects

500 W 2nd St

Case Date:
8/15/2024

When road work done on 500 2nd street

closed #160285

City Construction Projects

4021 E Morningside DR

Case Date:
7/25/2017

I just took possession of a home I bought as sidewalk construction on E. Morningside was being completed. The home is at 4021 E. Morningside. It is my understanding the City redid part of the driveway after having to destroy it for sidewalk work. Unfortunately it appears a corner of the drive (front right / SE) is already cracking/chipping/spalling (see photo). I'm requesting the City patch this up before it continues to flake (not huge now but would like addressed so as not to spread) as an area driven over frequently. Otherwise looks fantastic and very happy with the new sidewalk and drive portion. Great neighborhood addition.

closed #193180

City Construction Projects

401 N Morton ST

Case Date:
8/28/2024

What is happening again on Clarizz street. How much money and time has the city wasted on what ever project this is. Surely we have better uses for our resources. Connie Clark

closed #182460

City Construction Projects

326 W 17th ST

Case Date:
1/11/2023

This sidewalk has been broken for FOR OVER 2 YEARS! And it has been reported before. It's been broken for so long you can see the damage on the satellite image you're using lmao. Pretty bad. Not just is the corner broken up into large chunks but going down the sidewalk east on 17th, the sidewalk has been worn down for years as well with no repair. One is walking on sharp pebbles instead of smooth sidewalk. Not sure what it takes for you all to actually give a shit and do something about it. But, y'know, it would be pretty cool if you did.