City Construction Projects
E 7th St, Bloomington, IN, USA
- Case Date:
- 4/17/2023
Left on Washington and Lincoln intersection as well. The curb is creating issues because it sticks out to far. Can you please update this
And if the vehicle cuts too close vehicle can be caught in the curb. Someone should check police reports and see how often police must do this. Pour gravel inside
They need to be filled with concrete because there are weeds in the curb area. Concerned about people falling off of curb area worried about bicyclists falling in.
Project feels unfinished
City Construction Projects
W 17th St & N College Ave, Bloomington, IN 47404, USA
- Case Date:
- 4/19/2023
My guess is you are aware that: (1) Driving west on 17th there is a small no left turn sign. (2) Drivers (to be kind) apparently aren't seeing the sign (surely they aren't ignoring it). Anyway, it is causing some big backups at times. I was there twice today and both times someone waited to turn left onto College. Not sure it is solveable, but hopefully there is something.
City Construction Projects
- Case Date:
- 5/11/2023
Lumber on round about Tapp Road going west just before taking 69N towards Indpls. Could be dangerous if it gets on rotunda especially at night!
City Construction Projects
800 East 10th Street
- Case Date:
- 8/3/2018
Please see attached photo. This location is at 10th and Park and has been reported to the IU Grounds Dept. as a tripping hazard. The gray bucket is there to indicate a bus pickup for the Boy Scouts that are in town but the metal and the sandbags are blocking the sidewalk, our crews moved the items off the sidewalk and into the homeowners yard. Please pickup. Thanks Jill.
City Construction Projects
2-54 E Winslow Rd, Bloomington, Indiana, 47401
- Case Date:
- 12/27/2019
Motorists are confused about which lane to be in going westbound on E. Winslow approaching S. Walnut since there is a solid white line dividing the two westbound lanes of the road. I have seen drivers in the right lane turning left onto southbound Walnut.
City Construction Projects
320 W 8th ST
- Case Date:
- 1/15/2020
7th and Union badly needs crosswalk for pedestrian and bike. Thank you!
City Construction Projects
1715 E Durham Ln, Bloomington, IN 47401, USA
- Case Date:
- 5/19/2020
NEED TREES AND BRUSH CLEARED NEAR CONCRETE WALKWAY ALONG WINSLOW ROAD
City Construction Projects
Miller & Henderson, Bloomington, IN 47401, USA
- Case Date:
- 7/16/2020
For weeks, the contractor doing the concrete curb work at Miller and Henderson has left a deep drop off as you head westbound on Miller to the stop sign unprotected. Of course they have plenty of barrels everywhere else where they filled in the cuts, but not at this the worst one. And every city utility worker coming to and fro from the Miller garage drives right by it.
City Construction Projects
- Case Date:
- 8/5/2020
Pot hole on Rogers road by Sherwood oaks church - dangerous! People are damaging their vehicles. Needs immediate action!
City Construction Projects
201-251 North Lincoln Street
- Case Date:
- 6/21/2017
Hi,
There's a couple of large road cuts at the intersection of Lincoln and 6th St. If the city is not planning on filling these any time soon could we at least get the sharp edges softened? Sometimes I've seen this done and it makes road cuts much easier to drive over without damaging your tires.
Thanks,
Vickie Nelson
Bloomington