uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (57)

closed #183345

City Construction Projects

323 S Grant ST

Case Date:
4/5/2023

There was a temporary traffic sign placed in front of the property. The street construction is complete, but the sign was never removed. The sign was blown over by the wind and has become an eye sore. It would be great if the city could get that picked up...

closed #183283

City Construction Projects

322 E Cottage Grove AVE

Case Date:
3/30/2023

Duke Energy contractors (B&B ?) are leaving signage scattered around. There is a pile of orange-stripped wood signs and associated sandbags lying on the alley on the west side of Grant between 10th and Cottage Grove, and also there are two large, metal sign supports lying at the SW and NW corners of the intersection of CG and Grant.

closed #183405

City Construction Projects

322 E Cottage Grove AVE

Case Date:
4/11/2023

City and/or Utility contractors (Duke, Meridiam, etc.) have been leaving signage scattered about the neighborhood. Currently, there is the following: 1) Tall, metal support at SW corner of Cottage Grove and Grant (322 E. Grant), 2) Identical metal support on south retaining wall of 414 E. Cottage Grove, 3) Pile of signage and sandbags on NE corner of 325 E. 10th Street, 4) Pile of signs in west yard of 418 N. Grant, 5) Bag of construction waste (NaOH ?) sitting on east side of Lincoln near 518 N. Lincoln.

closed #171454

City Construction Projects

320 W 8th ST

Case Date:
1/15/2020

7th and Union badly needs crosswalk for pedestrian and bike. Thank you!

closed #186433

City Construction Projects

317 S Rogers ST

Case Date:
12/6/2023

I let you know there duke engery doing road work 321 N Rogers St Bloomington, IN 47404 United States

closed #183420

City Construction Projects

2711 N Dunn ST

Case Date:
4/13/2023

Workers installing optic fiber cable in the neighborhood have left tools, trash, and a 15-20 foot pipe in our yard. We picked scattered stuff up but can't do anything with the tubing and pipe.

closed #193474

City Construction Projects

220 W 14th ST

Case Date:
9/10/2024

Sidewalk closed sign laying in the tree plot. There's no construction going on around here, so I am not sure how or why it's here. Just thought I would let you know in case you are missing one.

closed #159806

City Construction Projects

201-251 North Lincoln Street

Case Date:
6/21/2017

Hi, There's a couple of large road cuts at the intersection of Lincoln and 6th St. If the city is not planning on filling these any time soon could we at least get the sharp edges softened? Sometimes I've seen this done and it makes road cuts much easier to drive over without damaging your tires. Thanks, Vickie Nelson Bloomington

closed #171300

City Construction Projects

2-54 E Winslow Rd, Bloomington, Indiana, 47401

Case Date:
12/27/2019

Motorists are confused about which lane to be in going westbound on E. Winslow approaching S. Walnut since there is a solid white line dividing the two westbound lanes of the road. I have seen drivers in the right lane turning left onto southbound Walnut.

closed #186167

City Construction Projects

1907 S Sussex DR

Case Date:
11/1/2023

Fiber construction contractors (AEG?) were in our neighborhood (Sycamore Knolls) at the start of October. They've since moved on, but left open holes and piping sticking out the ground all over the place. These were visible, but with the falling leaves they have become numerous trip hazards spread throughout the neighborhood.