City Construction Projects
Greenwood Ave, Bloomington, IN 47401, USA
- Case Date:
- 1/19/2023
One week ago, people were laying internet cable in our neighborhood. They left last Friday, but there are still sizeable holes in the streets, each of which is an injury and lawsuit waiting to happen. My yard has a hole in the grass and a pile of dirt. There are no covers for these holes, and they are very dangerous for kids and adults (its a walk-to-school route). This work was carried out with no notice to the households, and they left it unfinished with no safety precautions. I live at 1011 S. Greenwood Ave. This photo is of one the holes at the corner of Rose and Dexter, which I have to avoid while biking to work. It's about 10" across. Can you make sure that these holes are covered and that the dirt in my yard is cleared up? Thanks.
City Construction Projects
Indiana University, Bloomington
- Case Date:
- 4/4/2016
Road closed signs are knocked over and are in the southbound lane of Woodlawn.
City Construction Projects
Miller & Henderson, Bloomington, IN 47401, USA
- Case Date:
- 7/16/2020
For weeks, the contractor doing the concrete curb work at Miller and Henderson has left a deep drop off as you head westbound on Miller to the stop sign unprotected. Of course they have plenty of barrels everywhere else where they filled in the cuts, but not at this the worst one. And every city utility worker coming to and fro from the Miller garage drives right by it.
City Construction Projects
S Rogers St & W That Rd, Perry Township, IN 47403, USA
- Case Date:
- 8/16/2022
New traffic patterns require 4way stop or light. Please do not wait for the subdivision to be completed. Install now please.
City Construction Projects
W 17th St & N College Ave, Bloomington, IN 47404, USA
- Case Date:
- 4/19/2023
My guess is you are aware that: (1) Driving west on 17th there is a small no left turn sign. (2) Drivers (to be kind) apparently aren't seeing the sign (surely they aren't ignoring it). Anyway, it is causing some big backups at times. I was there twice today and both times someone waited to turn left onto College. Not sure it is solveable, but hopefully there is something.
City Construction Projects
- Case Date:
- 4/20/2022
The city recently replaced worn some worn curbs and this week repaved a big section of Park Ridge Road in Park Ridge East. The crew did an exceptional job! However, on the east side of the street between the park and Sheffield Drive there is a considerable amount of chunky gravel and dirt left on the sidewalk. Will the city please send someone to clean it up? Thank you so much.
City Construction Projects
- Case Date:
- 6/14/2022
Location, Ticket 180318, NW corner N Park Ridge Rd & E Cambridge Dr. Perhaps others?
City Construction Projects
- Case Date:
- 9/7/2022
Badly needed stop light at Tapp Rd. & Leonard Springs. Also, a tree blocks visibility at this location.
City Construction Projects
- Case Date:
- 12/3/2022
Orange barrels on 17th street , are creating a hazard pulling out of willis drive .
City Construction Projects
- Case Date:
- 12/22/2022
The newly redone exit on Clarizz for Bloomingfoods East and the new apartment complex is too narrow by about 3 feet. It is nearly impossible for two vehicles to be in the intersection at the same time, and turning in or out is in-executable while another vehicle is present. Personally I have seen many instances that a car has to stop in the intersection to allow for a car to clear the way. This is a highly trafficked intersection that will only become more heavily traveled once the multiplex is finished and occupied. Thus, this intersection poses great risk for incident in its current configuration.