City Construction Projects
305 S Lincoln ST
- Case Date:
- 6/24/2022
East-West alley between Girls and Boys Club and the building to the north needs repaved. It is in really bad shape and dangerous.It was never repaired after work was done in it. Thank you.
City Construction Projects
- Case Date:
- 7/11/2022
In front of house 725 E Second Street is a nasty utility cut.
City Construction Projects
- Case Date:
- 8/7/2022
Call toes second and Lincoln and second and College. Popo also third and Cory.
Utility cut 914 E. Atwater has sunken
City Construction Projects
925 E Atwater AVE
- Case Date:
- 8/13/2022
East 914 Atwater utility cut needs filled in
City Construction Projects
S Rogers St & W That Rd, Perry Township, IN 47403, USA
- Case Date:
- 8/16/2022
New traffic patterns require 4way stop or light. Please do not wait for the subdivision to be completed. Install now please.
City Construction Projects
301 E 20th ST
- Case Date:
- 8/18/2022
Street cuts on E. 20th between N. Dunn and Lincoln are excessive and damaging tires. Please fix before more cars are damaged. Thank you!
City Construction Projects
608 W Wylie St, Bloomington, IN 47403, USA
- Case Date:
- 8/19/2022
Hi, I live on W Wylie Street between Rogers and Fairview, and I'm super concerned about the detour down our street. On the face of it, this seems like a good solution, because our street is one-way and there is a construction detour sign on Rogers that would route people the right way and bypass the construction on Second Street.
As a resident, I can tell you that people race down this street the wrong way *all the time*, and with the construction detour they are now racing in the opposite direction as well. This is a one-lane street with the other lane used for on-street parking. I'm waiting for a bad head-on collision. Someone drove the wrong way down Wylie going at least 40 mph while I was writing this. Thanks for listening and doing anything you can to make this safer. I know they're breaking the law, but I don't want anyone to get hurt or killed. Thank you.
City Construction Projects
500 W Fairway LN
- Case Date:
- 9/1/2022
New construction site on South Rogers is scattering debris on the road. I live in Clear Creek housing edition and have to travel on South Rogers every day for work. In the past 2 weeks I have had two separate issues with the same brand of screws in my back left tire. I travel on I69 for work and have been traveling at 60 miles an hour with a screw in my tire. This has happened twice in two weeks at no fault of my own. This set of tires is less than 6 months old and today I found out from Royal Mazda that I need to purchase a new tire. This is unacceptable from a point of safety for the South Rogers neighborhood and an additional cost to citizen(s) of Bloomington.
City Construction Projects
- Case Date:
- 9/7/2022
Badly needed stop light at Tapp Rd. & Leonard Springs. Also, a tree blocks visibility at this location.
City Construction Projects
831 S Ransom LN
- Case Date:
- 9/9/2022
I met this morning with Mr. Nathan Bell (812-679-7436) who resides at 831 S Ransom Lane. Mr. Bell expressed concern about no speed limit signs along Ransom Lane between 2nd Street and Allen Street as this is a school bus corridor with safety concerns for his children and those of his neighbors. His formal request: install posted speed limit signs along Ransom Lane between 2nd Street and Allen Street.