uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (19)

closed #118693

City Construction Projects

S ROCKPORT RD

Case Date:
9/18/1997

Rockport between 37 and Country Club has become very hazardous during the detour. Tapp Rd construction has taken far too long for the size of the project. Its not a long section of road. why hasn't this project been finished and reopened? If there's a valid problem, city or county should monitor the traffic.

closed #96393

City Construction Projects

401 N Morton ST

Case Date:
5/25/2005

citizen querried in re plans for improvement for three locations: rodgers rd between sare and snoody, olcott in hyde park, and generally potholes throughout the city. said they were "aweful".

closed #66985

City Construction Projects

1204 S Grant ST

Case Date:
7/30/1997

Citizen objects that Utilities will only repave area torn up for water main installation. Says the work has damaged the whole street and it needs repaving. Says the front of her property has been damaged by storage & removal of gravel, etc. Wants her lawn repaired. Has spoken with Doug Jones who said Mike Farmer would call her. Has also spoken with Dana at Street.

closed #170276

City Construction Projects

720 W 7th ST

Case Date:
9/9/2019

I may have sent this to the wrong department earlier today. Cars are parking regularly in front of the hydrant on the North East corner of Maple Street at West 7th. Can you please come and repaint the curb? You guys did a great job repainting the curbs on W 7th but the curbs on Maple need it too. Thanks.

closed #170322

City Construction Projects

600 W 6th ST

Case Date:
9/12/2019

I feel like the city should know that I broke my foot walking down the horrible Near West Side sidewalk last week.

closed #170679

City Construction Projects

301-399 S Mitchell St, Bloomington, Indiana, 47401

Case Date:
10/10/2019

Was pulling to side of road to park I hit this drain. It broke the right leaf spring on my cargo trailer.

closed #170868

City Construction Projects

Bloomington, Indiana

Case Date:
11/2/2019

Olcott park pathway to Jackson Creek middle school parking lot. When the temperature drops below freezing, this becomes a sheet of ice due to some drainage from the football field flowing down the paved path. Dozens of school children use the path to get to and from school as well as community members. It has been a high slip risk For the last few years as this path does not receive ice removal or salting on a regular basis. Instead of trying to keep up with salting or removing the ice on this long path I hope the city could look into rerouting the source of the drainage to not flow on the pedestrian path.

closed #171157

City Construction Projects

3073-3099 E Moores Pike, Bloomington, Indiana, 47401

Case Date:
12/6/2019

Road striping/painting contractor created a major hazard and delay yesterday at E. Moores Pike/College Mall Rd/S Sare Rd.

closed #171172

City Construction Projects

301 E Winslow RD

Case Date:
12/9/2019

The sidewalk widening project along S. Henderson St. is extremely dangerous for pedestrians and a hazard for vehicles pulling in and out of Winslow Plaza as well. The contractor dug 2' deep x 2' footings for new curbs at the sidewalks crossing the entrances to Winslow Plaza and put up now warning signs, barricades, cones, or caution tape. No sidewalk closed signs have been put up. Who is supervising this project?

closed #166562

City Construction Projects

4612 W Arlington RD

Case Date:
11/15/2018

Where the new water line is going in on Arlington/17th there is cut actoss the road at the 46 bridge. It has been pretty deep to drive across but today on my way home the west bound lane has ~6inch drop towards the shoulder. Even slowing down I was afraid I damaged my car because you cant see the drop until you have already drove across it. Im in a bigger vechicle and it was a huge jar...