City Construction Projects
304 S Rogers ST
- Case Date:
- 8/28/1997
After traffic calming device was installed at the corner of 3rd and Rogers, sidewalk had to be realigned. Realigning meant tree had to be dug up and the lawn in this area was never fixed.
See letter
City Construction Projects
2100 S Bent Tree DR
- Case Date:
- 2/3/1999
Mr. Jones wrote letter dated 2/2/99 that stated that CBU crews constructed sanitary sewer thru east end of his property during 1995. The surveyor stake for the property line marker was removed and not replaced. Mr. Jones states that the easement agreement provides that the property will be returned to the original condition prior to construction work. Mr. Jones would like the marker replaced.
City Construction Projects
5900 N MAPLE GROVE RD
- Case Date:
- 11/8/2001
Fax was received stating that Mike and Julie Donham were upset with the final yard work at 515 S. Washington St. in Bloomington, IN. They feel add'l. topsoil and seeding are needed along sidewalk and 2 depressesions needed on south side of house.
City Construction Projects
1103 N Woodburn AVE
- Case Date:
- 1/22/2003
Letter stated Mr. Schatz feels that a crack (leak) in his pvc pipe connector to meter was caused by damage during construction. Customer had break repaired but received extra large water bill. Wants matter investigated and adjustment made.
City Construction Projects
1116 S College Mall RD
- Case Date:
- 10/20/2003
Desires a cleanout for the slotted drain in the driveway.
Desires a tree well for the gum tree on north side of drive.
Desires drainage improvements on the southeast side.
Desires opening in the median.