Search Results: (45)

closed #54387

City Construction Projects

100 E 6th ST

Case Date:
4/7/2000

due to the project at 7th and Walnut the lack of striping in the 100 Block of E. 6th is even more critical than before. Please ASAP stripe the angle parkinging in the 100 jBlock of E. 6th.

closed #56366

City Construction Projects

1809 E Southdowns DR

Case Date:
10/4/1999

STREET CUT STILL NEEDS REPAIRED WHERE CBU REPAIRED MAIN BREAK

closed #57792

City Construction Projects

309 N Walnut ST

Case Date:
6/16/1999

sidewalk torn up in the 300 block, in front of Taco Bell (think by gas company) and was never repaired. Has been out for awhile and is a hazard to pedestrians (Carol I also think they did not repair the sidewalk next to Alice's house on Morton and 10th. You may want to address both of these walks with them)

closed #60148

City Construction Projects

925 S Ballantine RD

Case Date:
10/22/1998

The residents at 925 S. Ballantine had a contractor make a street cut across Ballantine. The cut is sinking in and has become dangerous.

closed #61981

City Construction Projects

2610 S Rockport RD

Case Date:
8/31/1998

Mr. Turpin called and reported that when the Utilities Dept. installed new line on Rockport Road they dug up entry to his driveway. At that time the driveway had a culvert. When redoing his driveway, no culvert was installed. Water backs up in his driveway now and he has a "muddy mess." He would like a culvert installed since he is afraid his car will be damaged.

closed #62098

City Construction Projects

111 S ROGERS ST

Case Date:
8/20/1998

Mrs. Myers called on behalf of her son, Joe Myers, because the alley-way running from Rogers St. east -west near the Rogers St. fire station needs to be paved. She wants the Street department to have more money so that they can pave her alley sooner than the fall of 1999, when Bobby Chestnut told her it would be paved.

closed #63048

City Construction Projects

2308 S Cutter CT

Case Date:
7/8/1998

(Please call the above complainant for additional information). Says Utilities dug a hole to install a manhole and did not finish grading around it.

closed #63397

City Construction Projects

1901 S Weimer RD

Case Date:
6/23/1998

Ms Sudbury is unhappy with the amount of traffic that is using Wapehani Road as a cut-through from the Wapehani Hills development.

closed #64925

City Construction Projects

616 S Jordan AVE

Case Date:
2/27/1998

GRAVEL AND UTILITY TRUCKS ARE LEFT ON THIS STREET WHEN THE CREW ISN'T WORKING HERE. THE GRAVEL DUST CAUSES A MESS. HER CAR IS DIRTY, AND SHE CAN'T OPEN HER WINDOWS BECAUSE IT GETS HER HOUSE DIRTY.

closed #65536

City Construction Projects

904 S Rose AVE

Case Date:
12/18/1997

MOUND OF DIRT LEFT IN YARD , WOULD LIKE YARD REPAIRED