City Construction Projects
322 E Cottage Grove AVE
- Case Date:
- 3/30/2023
Duke Energy contractors (B&B ?) are leaving signage scattered around. There is a pile of orange-stripped wood signs and associated sandbags lying on the alley on the west side of Grant between 10th and Cottage Grove, and also there are two large, metal sign supports lying at the SW and NW corners of the intersection of CG and Grant.
City Construction Projects
322 E Cottage Grove AVE
- Case Date:
- 4/11/2023
City and/or Utility contractors (Duke, Meridiam, etc.) have been leaving signage scattered about the neighborhood. Currently, there is the following:
1) Tall, metal support at SW corner of Cottage Grove and Grant (322 E. Grant), 2) Identical metal support on south retaining wall of 414 E. Cottage Grove, 3) Pile of signage and sandbags on NE corner of 325 E. 10th Street, 4) Pile of signs in west yard of 418 N. Grant, 5) Bag of construction waste (NaOH ?) sitting on east side of Lincoln near 518 N. Lincoln.
City Construction Projects
320 W 8th ST
- Case Date:
- 1/15/2020
7th and Union badly needs crosswalk for pedestrian and bike. Thank you!
City Construction Projects
317 S Rogers ST
- Case Date:
- 12/6/2023
I let you know there duke engery doing road work 321 N Rogers St
Bloomington, IN 47404
United States
City Construction Projects
301 E Winslow RD
- Case Date:
- 12/9/2019
The sidewalk widening project along S. Henderson St. is extremely dangerous for pedestrians and a hazard for vehicles pulling in and out of Winslow Plaza as well. The contractor dug 2' deep x 2' footings for new curbs at the sidewalks crossing the entrances to Winslow Plaza and put up now warning signs, barricades, cones, or caution tape. No sidewalk closed signs have been put up. Who is supervising this project?
City Construction Projects
2907 S McIntyre Dr, Bloomington, Indiana, 47403
- Case Date:
- 11/19/2018
New Island in the middle of Tapp road just east of Kegg is not marked with any traffic cones or signs, hazardous, difficult to see
City Construction Projects
2711 N Dunn ST
- Case Date:
- 4/13/2023
Workers installing optic fiber cable in the neighborhood have left tools, trash, and a 15-20 foot pipe in our yard. We picked scattered stuff up but can't do anything with the tubing and pipe.
City Construction Projects
201-251 North Lincoln Street
- Case Date:
- 6/21/2017
Hi,
There's a couple of large road cuts at the intersection of Lincoln and 6th St. If the city is not planning on filling these any time soon could we at least get the sharp edges softened? Sometimes I've seen this done and it makes road cuts much easier to drive over without damaging your tires.
Thanks,
Vickie Nelson
Bloomington
City Construction Projects
2-54 E Winslow Rd, Bloomington, Indiana, 47401
- Case Date:
- 12/27/2019
Motorists are confused about which lane to be in going westbound on E. Winslow approaching S. Walnut since there is a solid white line dividing the two westbound lanes of the road. I have seen drivers in the right lane turning left onto southbound Walnut.
City Construction Projects
1907 S Sussex DR
- Case Date:
- 11/1/2023
Fiber construction contractors (AEG?) were in our neighborhood (Sycamore Knolls) at the start of October. They've since moved on, but left open holes and piping sticking out the ground all over the place. These were visible, but with the falling leaves they have become numerous trip hazards spread throughout the neighborhood.