closed #166580

City Construction Projects

2907 S McIntyre Dr, Bloomington, Indiana, 47403

Case Date:
11/19/2018

New Island in the middle of Tapp road just east of Kegg is not marked with any traffic cones or signs, hazardous, difficult to see

closed #164720

City Construction Projects

2911-3099 East Rogers Road

Case Date:
6/7/2018

The new sidewalks on the northwest corner of Sare and Rogers have been badly damaged from utility trucks driving on them. There could have been some plywood or metals plates used to cover the walks to protect them.

closed #180893

City Construction Projects

300 E Smith AVE

Case Date:
8/4/2022

A contractor (possibly PCT?) installing a utility pole at NW corner of Lincoln and Smith is blocking the alley and blocking parking on private property.

closed #182502

City Construction Projects

301 E 19th ST

Case Date:
1/16/2023

Whenever I return home from work every night, I am always greeted by the mud from construction. Someone else has reported this issue December last year, but I don’t see any improvement.

closed #181087

City Construction Projects

301 E 20th ST

Case Date:
8/18/2022

Street cuts on E. 20th between N. Dunn and Lincoln are excessive and damaging tires. Please fix before more cars are damaged. Thank you!

closed #171172

City Construction Projects

301 E Winslow RD

Case Date:
12/9/2019

The sidewalk widening project along S. Henderson St. is extremely dangerous for pedestrians and a hazard for vehicles pulling in and out of Winslow Plaza as well. The contractor dug 2' deep x 2' footings for new curbs at the sidewalks crossing the entrances to Winslow Plaza and put up now warning signs, barricades, cones, or caution tape. No sidewalk closed signs have been put up. Who is supervising this project?

closed #170679

City Construction Projects

301-399 S Mitchell St, Bloomington, Indiana, 47401

Case Date:
10/10/2019

Was pulling to side of road to park I hit this drain. It broke the right leaf spring on my cargo trailer.

closed #66506

City Construction Projects

304 N BRYAN ST

Case Date:
9/10/1997

The sewer in the alley behind 304 N. Bryan St. was dug up by private contractor. After the work was completed, the hole was improperly filled in, which has caused a sink hole.

closed #118795

City Construction Projects

304 S Rogers ST

Case Date:
8/28/1997

After traffic calming device was installed at the corner of 3rd and Rogers, sidewalk had to be realigned. Realigning meant tree had to be dug up and the lawn in this area was never fixed. See letter

closed #180415

City Construction Projects

305 S Lincoln ST

Case Date:
6/24/2022

East-West alley between Girls and Boys Club and the building to the north needs repaved. It is in really bad shape and dangerous.It was never repaired after work was done in it. Thank you.