closed #202952
City Construction Projects
414 E Cottage Grove AVE
- Case Date:
- 5/26/2025
Cavity forming alongside water meter in ROW close to SW corner of lot.
Cavity forming alongside water meter in ROW close to SW corner of lot.
The new sidewalks on the northwest corner of Sare and Rogers have been badly damaged from utility trucks driving on them. There could have been some plywood or metals plates used to cover the walks to protect them.
There is a road drain across the street from me, North side, and I notice the drain there has the beginnings of cavitation, which if it goes, could be dangerous
The current construction project on 2nd street is extremely disruptive and causes the building to shake. For necessary/emergency daytime construction this is totally understandable, but the project on 2nd st (between Walnut/Rogers) has been doing construction only from late evening to overnight around 4-5am every day. I have not slept since the construction started a week ago and it is scheduled to continue another full week. Even if there is a permit to be exempt from the noise ordinance, please consider rescheduling this work to take place during daytime hours. As I said, the deeper digging affects the foundation of the building, causing very irritating vibrations that give me headaches and make sleep impossible. It has affected my work life and mental health to miss so much sleep. My window faces the road and this has been an absolute nightmare of a time for me.