City Construction Projects
2-54 E Winslow Rd, Bloomington, Indiana, 47401
- Case Date:
- 12/27/2019
Motorists are confused about which lane to be in going westbound on E. Winslow approaching S. Walnut since there is a solid white line dividing the two westbound lanes of the road. I have seen drivers in the right lane turning left onto southbound Walnut.
City Construction Projects
320 W 8th ST
- Case Date:
- 1/15/2020
7th and Union badly needs crosswalk for pedestrian and bike. Thank you!
City Construction Projects
Miller & Henderson, Bloomington, IN 47401, USA
- Case Date:
- 7/16/2020
For weeks, the contractor doing the concrete curb work at Miller and Henderson has left a deep drop off as you head westbound on Miller to the stop sign unprotected. Of course they have plenty of barrels everywhere else where they filled in the cuts, but not at this the worst one. And every city utility worker coming to and fro from the Miller garage drives right by it.
City Construction Projects
- Case Date:
- 8/5/2020
Pot hole on Rogers road by Sherwood oaks church - dangerous! People are damaging their vehicles. Needs immediate action!
City Construction Projects
- Case Date:
- 4/20/2022
The city recently replaced worn some worn curbs and this week repaved a big section of Park Ridge Road in Park Ridge East. The crew did an exceptional job! However, on the east side of the street between the park and Sheffield Drive there is a considerable amount of chunky gravel and dirt left on the sidewalk. Will the city please send someone to clean it up? Thank you so much.
City Construction Projects
- Case Date:
- 6/14/2022
Location, Ticket 180318, NW corner N Park Ridge Rd & E Cambridge Dr. Perhaps others?
City Construction Projects
W 17th St & N Walnut St, Bloomington, IN 47404, USA
- Case Date:
- 6/22/2022
Since cross traffic is not permitted on 17th Street between College and Walnut and east of Walnut, it seems the traffic light signaling through its regular cycle is needless and leading to long backups on Walnut. At least make it flashing yellow.
City Construction Projects
300 E Smith AVE
- Case Date:
- 8/4/2022
A contractor (possibly PCT?) installing a utility pole at NW corner of Lincoln and Smith is blocking the alley and blocking parking on private property.
City Construction Projects
S Rogers St & W That Rd, Perry Township, IN 47403, USA
- Case Date:
- 8/16/2022
New traffic patterns require 4way stop or light. Please do not wait for the subdivision to be completed. Install now please.
City Construction Projects
608 W Wylie St, Bloomington, IN 47403, USA
- Case Date:
- 8/19/2022
Hi, I live on W Wylie Street between Rogers and Fairview, and I'm super concerned about the detour down our street. On the face of it, this seems like a good solution, because our street is one-way and there is a construction detour sign on Rogers that would route people the right way and bypass the construction on Second Street.
As a resident, I can tell you that people race down this street the wrong way *all the time*, and with the construction detour they are now racing in the opposite direction as well. This is a one-lane street with the other lane used for on-street parking. I'm waiting for a bad head-on collision. Someone drove the wrong way down Wylie going at least 40 mph while I was writing this. Thanks for listening and doing anything you can to make this safer. I know they're breaking the law, but I don't want anyone to get hurt or killed. Thank you.