City Construction Projects
1009 E Miller DR
- Case Date:
- 8/14/2024
You drove over countless potholes to install a bunch of new roadbumps! Congratulations, you just increased wear and tear and everyone's vehicles without making the roads any safer at all.
City Construction Projects
1020 S Woodlawn AVE
- Case Date:
- 6/10/2024
Why there road work sign near Bryan park pool
City Construction Projects
1101 S Rogers ST
- Case Date:
- 10/2/2024
On this property on the Allen street side, AEG left a 2ft wide and 3ft deep hole. This was months ago and the homeowner has left several messages. Also across from her property on Allen Street is an even larger whole near the sidewalk that was left by AEG.
City Construction Projects
1521 S Arbors LN
- Case Date:
- 3/12/2023
Moors and Clarizz, the fiber contractors left a large rectangular hole in the asphalt by the arbors entrance
City Construction Projects
1907 S Sussex DR
- Case Date:
- 11/1/2023
Fiber construction contractors (AEG?) were in our neighborhood (Sycamore Knolls) at the start of October. They've since moved on, but left open holes and piping sticking out the ground all over the place. These were visible, but with the falling leaves they have become numerous trip hazards spread throughout the neighborhood.
City Construction Projects
301 E Winslow RD
- Case Date:
- 12/9/2019
The sidewalk widening project along S. Henderson St. is extremely dangerous for pedestrians and a hazard for vehicles pulling in and out of Winslow Plaza as well. The contractor dug 2' deep x 2' footings for new curbs at the sidewalks crossing the entrances to Winslow Plaza and put up now warning signs, barricades, cones, or caution tape. No sidewalk closed signs have been put up. Who is supervising this project?
City Construction Projects
317 S Rogers ST
- Case Date:
- 12/6/2023
I let you know there duke engery doing road work 321 N Rogers St
Bloomington, IN 47404
United States
City Construction Projects
323 S Grant ST
- Case Date:
- 4/5/2023
There was a temporary traffic sign placed in front of the property. The street construction is complete, but the sign was never removed. The sign was blown over by the wind and has become an eye sore. It would be great if the city could get that picked up...
City Construction Projects
500 W Fairway LN
- Case Date:
- 9/1/2022
New construction site on South Rogers is scattering debris on the road. I live in Clear Creek housing edition and have to travel on South Rogers every day for work. In the past 2 weeks I have had two separate issues with the same brand of screws in my back left tire. I travel on I69 for work and have been traveling at 60 miles an hour with a screw in my tire. This has happened twice in two weeks at no fault of my own. This set of tires is less than 6 months old and today I found out from Royal Mazda that I need to purchase a new tire. This is unacceptable from a point of safety for the South Rogers neighborhood and an additional cost to citizen(s) of Bloomington.
City Construction Projects
728 W Allen ST
- Case Date:
- 1/24/2023
Intersection of Patterson and Allen. If heading north on Patterson, there is a hump as you cross Allen street at the light. When doing 30mph(the speed limit) it's enough to upset steering and cause traction control to come on.