City Construction Projects
1005 S Covenanter DR
- Case Date:
- 8/11/2020
The drainage easement at the south end of Greenwood Dr., where it dead ends into the sidewalk, is blocked with a landslide of debris. The water level rose to 3 feet on either side of the sidewalk and covered three properties adjacent to the clogged drain with water and debris. Thank you for your help. Jim and Debbie Quinn
City Construction Projects
1016 S Mitchell ST
- Case Date:
- 4/2/2013
A new sidewalk in this area was installed, but the road doesn't seem to be finished. There are huge potholes and it is unsafe for bikes, pedestrians, and vehicles.
City Construction Projects
1124 S College Mall RD
- Case Date:
- 10/16/2003
Ms. Black stated that she had heard the Weddle Bro's were only going to place sod on one side of the sidewalk. She was very concerned with this.
City Construction Projects
1204 E Wylie ST
- Case Date:
- 5/17/1995
A section of sidewalk was removed last fall and was never replaced.
City Construction Projects
1210 W 8th ST
- Case Date:
- 12/14/1995
Street Dept. is installing a handicap ramp in front of his property. He says that the property is not handicap accessible and that there shouldn't be a ramp there. Sidewalk crews told him that they are required to put in ramps per ADA.
City Construction Projects
1427 W Allen ST
- Case Date:
- 1/1/2022
Please have public streetlights installed at the entrance of Whittington Commons on Allen Street. It is very dark, and it is difficult to see entrance. I know this is a private road within WC, but Allen is a public street and it is a hazard to not have streetlights at entrance given the public sidewalk crosses the entrance. Light it up!
City Construction Projects
1924 E Marilyn DR
- Case Date:
- 4/5/2011
Received email from Leland Rogers concerned about the timing of the Marilyn Drive Sidewalk Project.
City Construction Projects
2901 S Olcott BLVD
- Case Date:
- 5/5/2019
2901 Olcott. Dead branches, over sidewalk and street. Hit by trucks, knocked down by storms.
City Construction Projects
301 E Winslow RD
- Case Date:
- 12/9/2019
The sidewalk widening project along S. Henderson St. is extremely dangerous for pedestrians and a hazard for vehicles pulling in and out of Winslow Plaza as well. The contractor dug 2' deep x 2' footings for new curbs at the sidewalks crossing the entrances to Winslow Plaza and put up now warning signs, barricades, cones, or caution tape. No sidewalk closed signs have been put up. Who is supervising this project?
City Construction Projects
304 S Rogers ST
- Case Date:
- 8/28/1997
After traffic calming device was installed at the corner of 3rd and Rogers, sidewalk had to be realigned. Realigning meant tree had to be dug up and the lawn in this area was never fixed.
See letter